MANUAL TRANSMISSIONS
Ford (Mazda) M5OD 5-Speed
APPLICATION
TRANSMISSION APPLICATION
Application |
Transmission |
Engine |
Ford |
Explorer |
M5OD-R1 |
4.0L SFI |
Explorer |
M5OD-R1 |
5.0L SFI |
Ranger |
M5OD-R1 |
2.3L SFI |
Ranger |
M5OD-R1 |
3.0L SFI |
Ranger |
M5OD-R1 |
4.0L SFI |
Bronco |
M5OD-R2 |
5.0L SFI |
F-150/250 LD |
M5OD-R2 |
4.9L SFI |
F-150/250 LD |
M5OD-R2 |
5.0L SFI |
Mazda |
B2300 |
M5OD-R1 |
2.3L SFI |
B3000 |
M5OD-R1 |
3.0L SFI |
B4000 |
M5OD-R1 |
4.0L SFI |
IDENTIFICATION
The M5OD identification tag is located on left side of transmission main case. Vehicle certification label, located on left side door lock pillar, lists applicable transmission identification codes under TRANS space. M5OD-R1 transmission is used in Explorer, Ranger and Mazda "B" series models, and is identified by M/D code on label. M5OD-R2 transmission is used in Bronco and F-150/250 models, and is identified by "M" code on label.
DESCRIPTION
This Mazda built transmission is a fully synchronized, 5-speed, top shift transmission. Fifth gear is equipped with an overdrive gear ratio. All gear changes, including reverse are accomplished with synchronizer sleeves. Transmission case is aluminum alloy with steel bearing race inserts.
LUBRICATION & ADJUSTMENTS
See appropriate TRANSMISSION SERVICING - M/T article in TRANSMISSION SERVICING.
ON-VEHICLE SERVICE
GEARSHIFT LEVER REPLACEMENT
Removal
Shift transmission to Neutral position. Remove transfer case shift lever knob (if equipped). Remove carpet or floor mat to expose transmission shift lever boot screws. Remove transmission shift lever boot screws. Slide boot upward on shift lever to expose transmission shift lever nut and bolt. Remove shift lever nut, bolt and shift lever.
Installation
Install transmission shift lever. Ensure flat on transmission shift lever aligns with flat on transmission stub shaft so that shift lever bolt installs fully. Tighten bolt/nut to specification. See TORQUE SPECIFICATIONS. To complete installation, reverse removal procedure.
EXTENSION HOUSING SEAL
Removal & Installation
Remove drive shaft. Using appropriate seal remover, remove extension housing seal. Using appropriate seal installer, install NEW seal on extension housing. Lubricate oil seal lip prior to installation. Ensure oil seal drain hole faces downward. Install drive shaft.
EXTENSION HOUSING BUSHING
Extension housing bushing cannot be serviced. If bushing requires service or replacement, extension housing must be replaced as a unit.
TROUBLE SHOOTING
See TROUBLE SHOOTING - BASIC PROCEDURES
article in GENERAL TROUBLE SHOOTING section.
REMOVAL & INSTALLATION
See appropriate TRANSMISSION REMOVAL & INSTALLATION - M/T
article in TRANSMISSION SERVICING.
TRANSMISSION DISASSEMBLY
- Remove transmission drain plug and drain transmission. Remove top cover assembly and extension housing. Remove speedometer drive gear and steel ball (if equipped). If necessary, remove rear oil passage. Lock transmission into 1st and 3rd gears. On Bronco and F-150/250 models, ensure staked areas securing output shaft and countershaft lock nuts are fully released or thread damage will occur. On all models, remove and discard countershaft rear bearing lock nut.
- Remove rear bearing and thrust washer. Remove and discard output shaft rear bearing lock nut. Remove reverse idler shaft attaching bolt. See Fig.
1. Remove reverse idler gear assembly by grasping and pulling rearward. Using remover/replacer tube, forcing screw and bearing puller, remove output shaft rear bearing from output shaft.
Fig. 1: Removing Reverse Idler Shaft Fixing Bolt
Courtesy of FORD MOTOR CO.
- Using brass drift and hammer, drive reverse gear from output shaft. Remove output shaft sleeve. See Fig.
2. Remove countershaft reverse gear with 2 needle bearings and reverse synchronizer ring.
- Remove thrust washer and split washer from countershaft. Remove 5th and reverse shift rod attaching bolt. Remove the following parts as an assembly; 5th-reverse synchronizer hub and sleeve assembly (countershaft), 5th-reverse shift fork and rod. DO NOT
separate steel ball and spring (removed from shift fork groove) unless necessary.
- Remove 5th gear synchronizer ring, 5th-reverse counter lever lock plate bolt, inner circlip and counter lever assembly from transmission case. DO NOT
remove Torx nut retaining counter lever pin at this time. Remove countershaft 5th gear with needle bearing.
- Remove output shaft 5th gear using bearing collet (for 3 1/2" bearing), gear removal collet assembly and remover/replacer tube with forcing screw. Remove 5th gear sleeve and Woodruff key or lock ball. Remove center and front bearing cover bolts.
- To remove front bearing cover, thread 2 bolts into front bearing cover bolt locations at 3 and 9 o'clock positions. Alternately tighten bolts lifting front bearing cover away from transmission case. DO NOT
remove plastic scoop ring from input shaft at this time.
- Remove oil trough from upper transmission case by removing bolt. See Fig.
3. Pull input shaft forward and remove input shaft bearing. Pull output shaft rearward.
- Pull input shaft forward and separate it from output shaft assembly. Incline output shaft upward and lift from transmission case. Remove input shaft from transmission case.
- Remove countershaft front and center bearings by moving countershaft forward and rearward. Pull countershaft rearward to permit clearance for bearing puller behind countershaft front bearing. Remove countershaft front bearing. Remove countershaft through top of transmission case.
Fig. 2: Exploded View Of Rear Housing Components
Courtesy of FORD MOTOR CO.
Fig. 3: Exploded View Of Transmission Main Case Components
Courtesy of FORD MOTOR CO.
COMPONENT DISASSEMBLY & REASSEMBLY
INPUT SHAFT
Disassembly
Remove and discard plastic scoop ring. Using bearing cone remover/installer and arbor press, press tapered roller bearing from input shaft. See Fig.
4. For cleaning and inspection of components, see CLEANING & INSPECTION.
Reassembly
Using a press and bearing cone remover/installer, install input shaft bearing onto input shaft. Install NEW plastic scoop ring onto input shaft. Manually rotate ring clockwise to ensure input shaft holes properly engage scoop ring. A click should be heard as scoop ring notches align with input shaft holes.
Fig. 4: Removing Input Shaft Bearing
Courtesy of FORD MOTOR CO.
OUTPUT SHAFT
Disassembly
- Note location of output shaft flange. See Fig.
5. Use this flange as reference point and dividing line during assembly procedure. Remove pilot bearing, retaining ring, needle bearing (plain) and spacer from front of output shaft. See Fig.
6.
- Position front (short side) of output shaft so that it faces upward. Lift off the following components as a unit; clutch hub and sleeve assembly (3rd-4th), 3rd gear synchronizer ring, 3rd gear and needle bearing. See Fig.
6.
NOTE: |
Ensure output shaft flange does not contact or ride upward onto press cradle. Improper positioning of output shaft can cause component damage. |
- Position output shaft with rear end (long side) facing upward. Position output shaft into press with press cradle contacting lower part of 2nd gear. See Fig.
7.
- Press off the following components as a unit; center bearing, 1st gear sleeve, 1st gear and needle bearing, 1st-2nd clutch hub and sleeve assembly, 1st-2nd synchronizer rings, 2nd gear and needle bearing. For cleaning and inspection of components, see CLEANING & INSPECTION.
Fig. 5: Locating Flange On Output Shaft Assembly
Courtesy of FORD MOTOR CO.
Fig. 6: Exploded View Of Front Of Output Shaft
Courtesy of FORD MOTOR CO.
Fig. 7: Exploded View Of Rear Of Output Shaft
Courtesy of FORD MOTOR CO.
Reassembly
- Ensure center bearing outer race is installed into transmission case. Position output shaft so that rear (long side) faces upward.
- Install components onto output shaft in following order; 2nd gear needle bearing, 2nd gear, 2nd gear synchronizer ring, 1st-2nd clutch hub and sleeve assembly, 1st gear synchronizer ring, 1st gear needle bearing, 1st gear, 1st gear sleeve and inner center bearing. Ensure narrow width of 1st-2nd synchronizer faces 2nd gear. See Fig.
7.
- Press center bearing onto rear (long side) of output shaft. Position output shaft front (short side) facing upward. Install parts in following order; 3rd gear needle bearing, 3rd gear and 3rd gear synchronizer ring.
- Mate 3rd-4th clutch hub synchronizer key groove with reference mark on clutch hub sleeve. Install 3rd-4th clutch hub and sleeve with reference mark and long clutch hub flange facing rearward. See Fig.
6 and Fig.
15
. Install spacer and retainer on output shaft.
- Using a feeler gauge, measure clutch hub end play. Adjust 3rd-4th clutch hub end play to .00-.002" (.00-.05 mm) by selecting proper retaining ring. Retaining rings are available in thicknesses of .59-.077" (1.50-1.95 mm) in .002" (.05 mm) increments.
REVERSE IDLER GEAR
Disassembly & Reassembly
- Remove retaining ring, spacer, idler gear, needle bearing and thrust washer. For cleaning and inspection of components, see CLEANING & INSPECTION.
- To reassemble, reverse disassembly procedure. Ensure that tab on thrust washer mates with groove on reverse idler shaft to prevent rotation of thrust washer. See Fig.
8.
- Install original retaining ring onto reverse idler gear shaft. Insert feeler gauge between retaining ring and reverse idler gear to measure reverse idler gear end play. Adjust reverse idler gear end play to .004-.008" (.10-.20 mm). Reverse idler gear retaining rings are available in thicknesses of .059-.075" (1.50-1.90 mm) in .004" (.10 mm) increments.
Fig. 8: Assembling Reverse Idler Gear
Courtesy of FORD MOTOR CO.
TOP COVER
Disassembly
NOTE: |
For reference during assembly, notice that grooves in bushing align with slots in lower shift lever pivot ball. Notice that the notch in the lower shift lever faces toward front of transmission. |
-
If necessary, remove gearshift lever boot (7277) and gearshift lever from case cover (7222) if not removed during disassembly. Remove three dust cover retaining screws using a T30 Torx® Allen wrench. Remove dust cover.
- Position top cover assembly into Top Cover Holding Fixture T88T-7025-C or equivalent.
Fig. 9: Positioning Top Cover Assembly On Special Tool
Courtesy of FORD MOTOR CO.
- Remove backup lamp switch from top cover. Remove backup lamp switch pin from groove in top cover.
Fig. 10: Locating Backup Lamp Switch, Spring & Detent Balls
Courtesy of FORD MOTOR CO.
- Remove manual lever position (MLP) switch and pin from case cover.
- Invert top cover assembly on Top Cover Holding Fixture T88T-7025-C or equivalent. Using a 5/32-inch drift punch, remove spring pins retaining shift forks to the shift rail.
Fig. 11: Removing Spring Pins Retaining Shift Forks To Shift Rail
Courtesy of FORD MOTOR CO.
- Make sure all shift rails and gates are positioned in NEUTRAL. Remove and discard spring pins retaining shift gates to shift rails. Remove shift gates.
- Remove three rubber plugs sealing shift rod service bores.
WARNING: |
WEAR SAFETY GLASSES WHILE PERFORMING SHIFT RAIL REMOVAL PROCEDURE. |
CAUTION: |
Perform the following shift rail removal procedures with great care. Cover the lock ball bores and friction device and spring seats with a clean cloth held firmly in place during shift rail removal. Failure to firmly cover lock ball bores and friction device can result in component loss when the ball/friction device and spring forcefully leave their installed positions. |
-
Remove fifth/reverse shift rail from top cover through service bore. If necessary, insert a 5/16-inch drift punch through spring pin bore and gently rock shift rail from side to side while maintaining rearward pressure.
- Remove first/second shift rail from top cover through service bore. If necessary, insert a 5/16-inch drift punch through spring pin bore and gently rock shift rail from side to side while maintaining rearward pressure.
- Remove third/fourth shift rail from top cover through service bore. If necessary, insert a drift punch through spring pin bore and gently rock shift rail from side to side while maintaining rearward pressure.
- Remove fifth/reverse cam lockout plate retaining bolts using a 10 mm socket. Remove fifth/reverse cam lockout plate
Fig. 12: Removing Fifth/Reverse Cam Lockout Plate Retaining Bolts
Courtesy of FORD MOTOR CO.
Reassembly
NOTE: |
During assembly, apply Motorcraft MERCON® Multi-Purpose Automatic Transmission Fluid XT-2-QDX or -DDX (E4AZ-19582-B) or equivalent to all rotating or sliding parts. |
-
Position top cover into Top Cover Holding Fixture T88T-7025-C or equivalent.
- Position fifth/reverse cam lockout plate to top cover. Install fifth/reverse cam lockout plate retaining bolts and tighten to 8-10 N.m (6-7 ft. lb.).
- Position third/fourth shift rail into top cover through service bore. If necessary, insert a 5/16-inch drift punch through spring pin bore and gently rock shift rail from side to side while maintaining forward pressure. Position detent ball and spring into top cover spring seats. Compress the detent ball and spring assembly using a suitable tool, and push shift rail into position over detent ball. Engage third/fourth shift fork with shift rail. Position friction device and spring into top cover spring seats. Compress friction device and spring assembly using a suitable tool, and push shift rail into position over friction device. Install spring pins retaining shift rail to top cover. Install spring retaining third/fourth shift fork to shift rail.
- Position first/second shift rail into top cover through service bore. If necessary, insert a 5/16-inch drift punch through spring pin bore and gently rock shift rail from side to side while maintaining forward pressure. Position detent ball and spring into top cover spring seats. Compress the detent ball and spring assembly using a suitable tool and push shift rail into position over detent ball. Engage first/second shift fork with shift rail. Position friction device and spring into top cover spring seats. Compress friction device and spring assembly using a suitable tool, and push shift rail into position over friction device. Install spring pins retaining shift rail to top cover. Install spring pin retaining first/second shift fork to shift rail.
- Position fifth/reverse shift rail to top cover through service bore. If necessary, insert a 5/16-inch drift punch through spring pin bore and gently rock from side to side while maintaining forward pressure. Position detent ball and spring into spring seats. Compress the detent ball and spring using a suitable tool, and push shift rail into position over detent ball. Engage fifth/reverse shift fork with shift rail. Install spring pins retaining shift rail to top cover. Install spring pin retaining fifth/reverse shift fork to shift rail.
- Install rubber plugs into service bores.
CAUTION: |
Improper installation of interlock pins will prevent activation of neutral switch and/or backup lamp switch. |
-
Install interlock pins into first/second and third/fourth shift rails. Make sure that large and small interlock pins are installed into their original positions.
- Apply sealant to backup lamp switch and neutral switch threads. Install switches to top cover and tighten to 25-35 N.m (18-26 ft. lb.).
- Position lower shift lever and dust cover assembly to top cover. Install three retaining screws and tighten to 8-11 N.m (6-8 ft. lb.).
INPUT SHAFT END PLAY
- Position transmission with clutch housing up. Ensure input shaft bearing is squarely positioned in bore. Using appropriate seal replacer, install front cover oil baffle (if removed). Install countershaft front bearing by hand.
- Using depth micrometer, measure height of input shaft bearing above transmission case, record as Dimension "A". Measure depth of input shaft bearing retainer bore, record as Dimension "B". See Fig.
13.
- Calculate input shaft end play as follows; Dimension "B" - (Dimension "A" + shim thickness)=.002-.006" (.05-.15 mm). Select shim to maintain end play within specified limit. See appropriate INPUT SHAFT SHIM SELECTION.
- Measure depth of countershaft bearing below transmission case, record as Dimension "C". Measure depth of countershaft bearing retainer bore, record as Dimension "D". See Fig.
13.
- Calculate countershaft end play as follows; Dimension "C" + (Dimension "D" + shim thickness)=.006-.010" (.15-.25 mm). Select shim to maintain end play within specified limit. See COUNTERSHAFT SPACER SELECTION.
Fig. 13: Determining End Play Shim Thickness
Courtesy of FORD MOTOR CO.
INPUT SHAFT SHIM SELECTION (M5OD-R1)
Part No. |
In. (mm) |
E8TZ-7029-C |
.106 (2.7) |
E8TZ-7029-D |
.110 (2.8) |
E8TZ-7029-E |
.114 (2.9) |
E8TZ-7029-F |
.118 (3.0) |
E8TZ-7029-G |
.122 (3.1) |
E8TZ-7029-H |
.125 (3.2) |
E8TZ-7029-J |
.129 (3.3) |
E8TZ-7029-K |
.133 (3.4) |
E8TZ-7029-L |
.137 (3.5) |
E8TZ-7029-M |
.141 (3.6) |
E8TZ-7029-N |
.145 (3.7) |
E8TZ-7029-P |
.149 (3.8) |
E8TZ-7029-R |
.153 (3.9) |
E8TZ-7029-A |
.157 (4.0) |
E8TZ-7029-B |
.161 (4.1) |
INPUT SHAFT SHIM SELECTION (M5OD-R2)
Part No. |
In. (mm) |
E8TZ-7029-FA |
.0551 (1.4) |
E8TZ-7029-GA |
.0590 (1.5) |
E8TZ-7029-HA |
.0629 (1.6) |
E8TZ-7029-JA |
.0669 (1.7) |
E8TZ-7029-S |
.0708 (1.8) |
E8TZ-7029-T |
.0748 (1.9) |
E8TZ-7029-U |
.0787 (2.0) |
E8TZ-7029-V |
.0826 (2.1) |
E8TZ-7029-W |
.0866 (2.2) |
E8TZ-7029-X |
.0905 (2.3) |
E8TZ-7029-Y |
.0944 (2.4) |
E8TZ-7029-Z |
.0984 (2.5) |
E8TZ-7029-AA |
.1023 (2.6) |
E8TZ-7029-BA |
.1062 (2.7) |
E8TZ-7029-CA |
.1102 (2.8) |
E8TZ-7029-DA |
.1141 (2.9) |
E8TZ-7029-EA |
.1181 (3.0) |
COUNTERSHAFT SPACER SELECTION
Part No. |
In. (mm) |
M5OD-R1 |
E8TZ-7C434-A |
.090 (2.3) |
E8TZ-7C434-B |
.094 (2.4) |
E8TZ-7C434-C |
.098 (2.5) |
E8TZ-7C434-D |
.102 (2.6) |
E8TZ-7C434-E |
.106 (2.7) |
E8TZ-7C434-F |
.110 (2.8) |
E8TZ-7C434-G |
.114 (2.9) |
E8TZ-7C434-H |
.118 (3.0) |
E8TZ-7C434-J |
.122 (3.1) |
M5OD-R2 |
E8TZ-7C434-K |
.122 (3.1) |
E8TZ-7C434-L |
.125 (3.2) |
E8TZ-7C434-M |
.129 (3.3) |
E8TZ-7C434-N |
.133 (3.4) |
E8TZ-7C434-P |
.137 (3.5) |
E8TZ-7C434-R |
.141 (3.6) |
E8TZ-7C434-S |
.145 (3.7) |
E8TZ-7C434-T |
.118 (3.0) |
CLEANING & INSPECTION
CLEANING
Wash all parts except seals, in cleaning solvent. Dry all parts with compressed air. DO NOT
spin bearings with compressed air.
INSPECTION
Bearings
Inspect bearings and replace if broken, worn or rough. Lubricate cleaned bearing. Hold bearing vertically by inner race and spin outer race by hand. DO NOT
spin bearings with compressed air. If roughness or vibration is noticed, bearing should be cleaned and lubricated again and retested. If roughness or vibration is noticed after 3 tests, replace bearing.
Countershaft
Inspect splines and gear teeth for damage or wear. Replace countershaft if bent, damaged or worn.
Input Shaft
Replace input shaft if splines are damaged, needle bearing surfaces are worn or rough, or other bearing surfaces are damaged.
Output Shaft
Mount output shaft in V-blocks. Check runout on shaft at several locations. If runout exceeds .002" (.05 mm), replace output shaft.
Synchronizers
If teeth on synchronizer ring are chipped, broken or worn, replace synchronizer ring. Note that 3rd gear synchronizer is different from others. To check for wear, mount synchronizer to mating gear and measure clearance between gear and synchronizer side faces using a feeler gauge. If clearance is less than .031" (.80 mm), replace synchronizer ring or mating gear.
Check contact surfaces of shift fork and clutch hub sleeve for wear or damage. Using feeler gauge, check shift fork-to-clutch hub sleeve clearance. Clearance should not exceed .031" (.80 mm).
Check operation of clutch hub sleeve installed on hub. Position clutch hub and sleeve horizontally. Lift hub approximately 3/4 of the way off sleeve and release. If hub does not return into sleeve, service as necessary.
TRANSMISSION REASSEMBLY
- Install countershaft, input shaft and output shaft assemblies into transmission case through top opening. See Fig.
14.
NOTE: |
Ensure that needle roller bearing is installed into input shaft and 4th gear synchronizer ring is installed at this time. |
- Mate input and output shaft assemblies by positioning them at an upward angle and setting them together. Install output shaft bearing using a brass drift. Ensure center bearing outer races are squarely positioned in bores. Install countershaft center bearing.
Fig. 14: Installing Output Shaft
Courtesy of FORD MOTOR CO.
- Position center bearing cover to transmission case with reference arrow pointing upward. Ensure all center bearing cover bolt heads are marked with an "8". Tighten center bearing cover bolts to specification. See TORQUE SPECIFICATIONS.
NOTE: |
If any input shaft, output shaft or countershaft related components are replaced, end play must be readjusted. See INPUT SHAFT END PLAY. |
- Install countershaft front bearing by hand. Apply grease to shim, bearing cover and oil baffle to retain them in position during assembly. Install shim with groove showing. Install spacer to transmission case countershaft front bearing bore.
- Tape input shaft splines along their entire length to prevent damage to oil seal lip. Apply a thin coat of lubricant to front cover oil seal lip. Apply 1/8" bead of sealant to front cover and retaining bolt threads. Ensure front bearing cover bolt heads are marked with a "6". Install front bearing cover. Tighten bolts to specification.
- Install Woodruff key or lock ball, 5th gear sleeve and 5th gear needle bearing onto 5th gear countershaft. To install 5th gear assembly on 2WD, use Gear Installing Spacer (T88T-7025-F). When tool bottoms, add Gear Installing Spacer (T88T-7025-G) and press 5th gear assembly all the way into position. Ensure long flange on 5th gear faces forward.
NOTE: |
On 4WD vehicles, installation of 5th gear is similar except that Remover/Replacer Tube (T85T-7025-A) and TOD Bearing Remover/Replacer Adapter (T84T-7025-A) are used. |
- Position 5th and reverse shift lever to transmission and install thrust washer and retaining ring. Apply sealant to counter lever retaining bolt threads. Tighten bolt to specification. If removed, position 5th-reverse shift fork and shift rail to top cover. See Fig.
15. Insert 5th-reverse shift rail through top cover bore and 5th-reverse shift fork. Install spring and detent ball to lower part of rod.
Fig. 15: Installing 5th-Reverse Shift Fork & Rail
Courtesy of FORD MOTOR CO.
- Assemble 5th-reverse synchronizer hub, sleeve and 5th gear synchronizer ring to 5th-reverse shift fork and rod assembly. Install longer flange, on 5th-reverse hub, sleeve and synchronizer assembly, toward front of transmission. Reference mark on synchronizer sleeve must be installed toward reverse gear. See Fig.
16.
Fig. 16: Installing Synchronizer Assembly
Courtesy of FORD MOTOR CO.
- Install and mate 5th-reverse shift fork and shift rail assembly to counter lever end. Install assembly in case, aligning threaded fixing bolt bores, in rail and transmission case. Apply sealant to bolt threads and tighten to specification. See TORQUE SPECIFICATIONS. Position oil passage to transmission case. Apply sealant to oil passage bolt threads and tighten to specification.
- If original clutch hub and/or counter reverse gear are being used, install original split washers onto countershaft and go to step 12). If synchronizer hub has been replaced, install original split washers. Using a feeler gauge, measure 5th-reverse synchronizer hub end play between synchronizer hub and split washers.
- End play should be 0-0.002" (0-.05 mm). Replace split washers to obtain proper end play. Split washers are available in thicknesses of .12-.14" (3.0-3.5 mm) in .004" (.10 mm) increments. Ensure NEW split washers are matched, having identical thickness. Go to next step.
- Install reverse synchronizer ring and needle bearing into reverse gear. Install counter reverse gear and needle bearings onto counter shaft as an assembly. Install thrust washer and press forward by hand against shoulder on countershaft.
- Maintain forward pressure and measure end play with feeler gauge between counter reverse gear and thrust washer. Counter reverse gear end play should be .010-.014" (.25-.36 mm). Replace thrust washer to obtain proper end play. Thrust washers are available in thicknesses of .293-.309" (7.45-7.85 mm) in .004" (.10 mm) increments.
- Temporarily install a spacer in place of countershaft bearing. Loosely install countershaft lock nut to retain components. Install reverse idler gear assembly. Apply sealant to retaining bolt threads. Install bolt and tighten to specification.
- Drive sleeve and reverse gear assembly onto output shaft, using Gear Replacing Spacer (T88T-7025-G), Shaft Adapter (T75L-7025-P), Shaft Adapter Screw (T75L-7025-K), Remover/Replacer Tube (T75L-7025-B, 2WD or T85T-7025-A, 4WD), nut and washer. Install reverse gear with longer flange facing forward. Install output shaft rear bearing.
- Remove temporary spacer from countershaft. Install countershaft rear bearing by hand. Ensure bearing is fully seated to avoid damage to output shaft threads.
- Lock transmission into 1st and 3rd gear. Install NEW output and countershaft lock nuts by hand. Tighten nuts to specification. See TORQUE SPECIFICATIONS. Stake lock nuts to bottom of shaft.
- Install speedometer drive gear and steel ball (if equipped). Apply 1/8" bead of sealant to case and install transmission extension housing. Place synchronizers in neutral position. DO NOT
apply sealant to mating surfaces of top cover or case.
- If necessary, lightly grease cover gasket to retain in position. Install top cover. Apply sealant to threads of 2 rearmost top cover bolts only. Install remaining bolts without sealant. Tighten bolts to specification. Fill transmission with Mercon automatic transmission fluid.
TORQUE SPECIFICATIONS
TORQUE SPECIFICATIONS
Application |
Ft. Lbs. (N.m) |
Center Bearing Cover Bolt |
14-19 (19-26) |
Countershaft Lock Nut |
94-144 (127-195) |
Drain Plug |
29-43 (39-58) |
Extension Housing Bolt |
24-34 (33-46) |
Filler Plug |
29-43 (39-58) |
Front Bearing Cover Bolt |
12-16 (16-22) |
Gear Shift Lever Bolt/Nut |
12-18 (16-24) |
Output Shaft Lock Nut |
160-203 (217-275) |
Reverse Idler Shaft Fixing Bolt |
58-86 (79-117) |
Top Cover Bolt |
12-16 (16-22) |
5th-Reverse Shift Rail Bolt |
16-22 (22-30) |
INCH Lbs. (N.m)
|
Counter Lever Bolt |
71-89 (8-10) |
Front Oil Passage Bolt |
72-96 (8-11) |
Rear Oil Passage Bolt |
60-84 (7-9) |